An old swimming pool often loses its luster and charm over time. Pool remodeling is a great way to make it rejuvenate and beautiful. Pool remodeling not only improves the look of your pool, but also increases its functionality. This process takes several steps, and each stage takes a different amount of time to complete.
It is important to understand the timing of the process of pool remodeling. It involves several steps such as planning, obtaining permits, and construction. It is important to know how long each step can take. This information will help you create the right time and plan for the entire project. Let’s understand the detailed timeline of pool remodeling.
1. Planning a pool remodeling
The first step in pool remodeling is planning. In this step, you decide on new designs and changes for your pool.
Choosing the right design
In this step, you get to decide which part of the pool you want to change. Do you want to install new tiles? Or maybe want to resize the pool? It may take 1-2 weeks to understand all these things.
List your priorities
It is important to list the needs of your pool. This helps you decide what is most urgent and what can be done later. Prioritize every change based on budget and utility.
Choosing the right material
Along with the design, you also have to select the material. Choose the right material for the tile, lining, and other parts of the pool that are durable and attractive. This selection enhances the beauty and durability of your pool.
Consulting Experts
At this stage, it may be beneficial to consult with experts in pool design and construction. With their advice, you can make your plan more accurate and effective.
2. Obtaining permits
The second step in pool remodeling is to obtain a permit. This step can be time-consuming.
Checking local regulations
First, you need to make sure you’re following all local rules and laws. It can take time to understand and apply these rules.
Permit Application and Acceptance
You will need to apply for a permit from the local authority. This process can take anywhere from 2 to 6 weeks, as the rules and approval times vary from region to region.
Managing Details
When applying for a permit, you should keep all the necessary details and documents ready. This makes the process faster and simpler. Details may include the pool’s design, construction plan, and safety measures.
Review and re-application
Sometimes, authorities may ask for additional information or modifications. In this case, you will have to review the application and resubmit it.
3. Pool Preparation and Demolition
Once the permit is granted, the next step in pool remodeling is to prepare and demolish the old pool.
Emptying the pool
At this stage, first of all the water is completely drained out of the pool. It may take a few days to drain the water and drain the pool.
Removing old parts
After this, the old parts of the pool are removed. It involves removing old tiles, linings, and other components. This phase can be completed in 1-2 weeks.
Caution during demolition
During demolition it is necessary to ensure that there is no unnecessary damage to the structure. Careful work strengthens the foundation for future construction.
Disposal of waste
After removing the old parts, it is necessary to dispose of the waste. This work makes the site clean and ready for construction.
4. Manufacture of new components of the pool
The most important stage of pool remodeling is the manufacture and installation of new components.
Construction of the new structure
If you are altering the size or depth of your pool, the new structure is constructed in this step. It may take time to pour concrete and set up the new structure.
New Lining and Tile Installation
Next, new linings and tiles are installed. This phase is completed in 2-4 weeks, as tile installation requires time and precision.
Additional features of the pool
Additional features for the pool, such as water fountains, lighting, or jacuzzi, can be added at this stage. It makes your pool more attractive.
Quality check of work
After the manufacture of each component, it is necessary to check its quality. This ensures that all the work is going to be done correctly and for a long time.
5. Finishing work of the pool
After the construction work is completed, the finishing touches are given to the pool.
Waterproofing & Sealing
Finishing involves waterproofing and sealing of the pool. This work helps to increase the longevity and robustness of the pool.
Cleaning and testing
Finally, the pool is cleaned and tested. It is ensured that all systems are working correctly and the pool is ready for use.
Final Decoration
Decorating the space around the pool can also be part of the finishing. This makes the pool and its surroundings even more attractive.
Installation of safety devices
Necessary safety devices, such as stairs and covers, are added to the pool at this stage to ensure safety.
6. Pool filling and final inspection
After finishing, the pool is filled with water.
To draw or fetch water
It may take 2-3 days for the pool to fill with water. After watering, it is ensured that the water level and quality are correct.
Final Inspection
Finally, the pool is inspected. It is ensured that all the work is done correctly and that the pool is safe.
Testing the pool’s system
In this step, the pool’s systems such as filters and pumps are tested. This ensures that they are working correctly.
Ready to use
Once the pool is completely ready, you can use it. The new and beautiful pool will enhance the beauty of your home.
The pool remodeling process usually takes 8-12 weeks to complete. This time depends on every stage, such as planning, obtaining permits, and construction work. Completing every step carefully and at the right time will not only keep your pool beautiful but also durable for a long time.